ECO SERVANTS
127 CEDAR CREEK DR, RUIDOSO, NM 88345 ecoservants.org

Total Revenue
$565,195
Total Expenses
$572,549
Net Assets
$63,028

Organizations Filed Purposes: NATURAL RESOURCE PRESERVATION AND RESTORATION

YCC & AMERICORP - FYE PROJECTS: 01. NEW TRAIL BUILT: 6.0 MILES 02. RESTORED: 12 MILES 03. ASSISTED WITH GRINDSTONE MARATHON 04. REMOVED NOXIOUS WEEDS THROUGHOUT LINCOLN COUNTY 05. CONSTRUCTED: MAKING NEW TRAILS AVAILABLE BY IMPLEMENTING SAFETY MEASURES, MAKING HANDICAP ACCESSIBLE, OR ENVIRONMENTAL PROTECTION MEASURES SUCH AS BOARDWALKS, GRADING, TRAIL BLAZING, CONVERTING A RAILROAD BED TO A TRAIL, ETC. THAT MAKE TRAILS NEWLY AVAILABLE. 06. TRAIL WAS BUILT 3.5 FEET WIDE WITH A 6% OUT-SLOP ON THE TREAD. THE CORRIDOR WAS CLEARED OF VEGETATION TO 12 FEET HIGH AND 3 FEET ON EACH SIDE FOR A MULTI-USE TRAIL (HIKERS,MOUNTAIN BIKERS AND EQUESTRIANS) THE TRAILS ARE GRINDSTONE LAKE TRAIL REROUTE (FLOODED TRAIL), HARRIS HOLLOW,ENCHANTMENT TRAIL, PERSHING TRAIL REROUTE, CAPITAN OVERLOOK REROUTE, CAPITAN OVERLOOK REROUTE, T-121B, FORT STANTON TRAIL, GRINDSTONE CONNECTOR, PERK CANYON OPEN BEGINNING. 07. THESE TRAILS WERE CONSTRUCTED TO TO THE USER CREATED TRAILS IN THE AREA WERE DANGEROUS AND UNSUSTAINABLE. REROUTES NEW TRAILS IMPROVED THE CONDITION OF THE PREVIOUS PORTION OF TRAILS SO THAT THEY ARE NOW MORE SUSTAINABLE AND USER FRIENDLY. GRINDSTONE TRAIL REROUTE WAS DUE TO GRINDSTONE LAKE BEING OVER FULL FROM DAM RECONSTRUCTION AND WATER BEING HELD IN THE DAM, INCREASED MOISTURE TO HELP LAKE REACH CAPACITY. 08. GREENTREE SOLID WASTE AUTHORITY WITH AN ELECTRONIC RECYCLINE EVENT. THE EVENT BROUGHT IN 4 TONS OF WASTE AND YEAR TO DATE OUR WORK HAS ASSISTED IN BRINGING IN 9 TONS OF E-WASTE. 09. RECYCLED PROJECTS 10. VARIOUS GPS PROJECTS FOR TRAINING, SKILL SET ENHANCEMENT AND IDENTIFYING ENDANGER SPECIES HABITATS. 11. ROCK ARMORING ON MUMEROUS TRAIL SYSTEMS. 12. REDUCED DOWN FUELS TO REDUCE WILDFIRE THREATS AND REDUCED ENCROACHING TREES. 13. REDUCED ENCROACHING TREES. 14. TREATED: REMOVED TREES COVERING TRAIL TREADS, REMOVED INVASIVE SPECIES, PLANTED NATIVE PLANTS, BUILT REPARIAN BUFFERS, IMPROVED TREAD/CORRIDOR OF EXISTING TRAIL OR MADE CHANGES TO INCREASE THE TRAIL LIFESPAN, REMOVED UNSAFE TRAEIL STRUCTURES, REPAIRED DAMAGE CAUSED BY VISITOR USE,MADE CHANGES TO INCREASE ACCESSIBILITY, CLEARED OF NATURAL DEBRIS (SUCH AS FALLEN TREES/LIMBS AND HAZARDOUS FUEL) AND UNNATURAL DEBRIS (SUCH AS DISASTER DEBRIS AND IMPROBERLY DISPOSED WASTE). CREATED TRAIL SIGN PLANS AND INSTALLED SIGNS FOR USERS TRAIL SAFETY AND ORIENTATION TO HELP REDUCE USERS GETTING LOST. 15. IMPROVING TREAD BY REMOVING BERMS FROM EDGE OF TRAIL, RESTORING FLAT OUT-SLOPED TRAIL AND REMOVED VEGETATION FROM THE TREAD. 16. CHANGE TO INCREASE ACCESSIBILITY BY CLEARING CORRIDOR OF VEGETATION. 17. CHANGES TO INCREASE TRAIL LIFESPAN BY BUILDING GRADE-DIPS TO SHED WATER AND REPAIRING TREAD AFFECTED BY ERROSION. 18. REPAIR DAMAGE CAUSED BY VISITOR USAGE BY REPAIRING RUTS AND BRAIDING. 19. REDUCE VEGETATION THAT COVERS TRAIL TREAD AND PROVIDE ERROSION ROUTES AND AREAS ON THE TRAIL THAT IS HAZARDOUS. 20. PROVIDE CLEAR ACCESS TO USERS, EMERGENCY AGENCIES IF NEEDED AND REDUCES FUELS FOR WILDFIRE REDUCTION. 21. ASSISTED THE VILLAGE OS RUIDOSO WITH NUMEROUS PROJECTS THROUGHOUT THE VILLAGE, ALTO LAKE, GRINDSTONE, WINGFIELD PARK, NOXIOUS WEED REMOVAL.

Executives Listed on Filing

Total Salary includes financial earnings, benefits, and all related organization earnings listed on tax filing

NameTitleHours Per WeekTotal Salary
Paula HendricksonASSOCIATE DI40$54,500
Stephen CarterEXECUTIVE DI40$54,500
Earl BellSECRETARY0$0
John TerrellPRESIDENT0$0

Data for this page was sourced from XML published by IRS (public 990 form dataset) from: https://s3.amazonaws.com/irs-form-990/202042119349300709_public.xml